Inspection Checklists by Job Type

Overview

This card provides the pre-inspection checklists for common Spartan installation job types that require permits and inspections. A job that fails inspection costs Spartan time, money, and reputation. Use this checklist before calling for inspection.

Who This Applies To

Install technicians on all permitted jobs.

Water Heater Installation — Pre-Inspection Checklist

  • [ ] Permit posted at job site
  • [ ] Expansion tank installed (required on closed-loop systems — confirm with local jurisdiction)
  • [ ] T&P relief valve properly installed with full-size drain line to within 6" of floor
  • [ ] Correct venting type and size (Category I, III, or direct vent per manufacturer)
  • [ ] Vent connectors properly supported with no sag
  • [ ] Gas connection leak-tested (no bubbles)
  • [ ] CO test completed and documented — readings in ServiceTitan
  • [ ] Seismic strapping (if required by local code)
  • [ ] Before and after photos uploaded to ServiceTitan

Sewer Line Replacement — Pre-Inspection Checklist

  • [ ] Permit posted at job site
  • [ ] Trench open for inspection (do NOT backfill before inspection)
  • [ ] Correct pipe material (confirm local code — PVC SDR-35 most common in Dayton area)
  • [ ] Correct slope: minimum 1/4" per foot
  • [ ] Proper cleanout access installed per code
  • [ ] All joints visible and accessible for inspector
  • [ ] Photos of installed pipe before backfill uploaded to ServiceTitan

Repiping — Pre-Inspection Checklist

  • [ ] Permit posted at job site
  • [ ] All new pipe visible (access panels open or walls open where required)
  • [ ] Correct pipe materials used (copper or PEX per Spartan standards)
  • [ ] Correct strapping intervals
  • [ ] Pressure test performed (document result)
  • [ ] No cross-connections between hot and cold
  • [ ] Photos of all rough-in work uploaded to ServiceTitan

Gas Line Work — Pre-Inspection Checklist

  • [ ] Permit posted at job site
  • [ ] Pressure test with manometer performed and documented
  • [ ] All gas connections leak-tested with approved solution (no bubbles)
  • [ ] CSST properly bonded (if applicable)
  • [ ] CO test for any gas appliance connection
  • [ ] Photos uploaded to ServiceTitan

Failed Inspection

If the inspection fails:

  • Note exactly what the inspector flagged
  • Contact Production Concierge immediately — same day
  • Do not correct the deficiency until Production Concierge approves the fix
  • Schedule reinspection after correction
  • Document all additional work in ServiceTitan
  • Related SOPs

    • Permit Application & Requirements
    • Photo Documentation Requirements (Install)
    • CO Testing After Water Heater Install
    Photo Documentation Requiremen...Warranty Documentation & Proce...