Week 2: Tool Certification & Equipment Training

Overview

Week 2 for install technicians focuses on install-specific tool certification and vehicle/trailer setup. The install tool list is more extensive than service tech and includes heavy equipment used for sewer, repipe, and large system installs.

Prerequisites

  • Week 1 Orientation & Safety Certification complete
  • Tool inventory reviewed with Operations Manager

Install Tool Certification Checklist

Senior tech or Operations Manager signs off each area:

Copper and PEX Installation

  • [ ] Copper pipe cutting, deburring, and sweat soldering (see Soldering & Flux Safety SOP)
  • [ ] PEX crimp method — crimp tool use and ring verification
  • [ ] PEX clamp (Oetiker) method
  • [ ] Press fitting tool (ProPress or equivalent) — operation and jaw inspection
  • [ ] SharkBite fitting use (when approved)

Drain and Sewer Tools

  • [ ] PVC pipe cutting and gluing (primer and cement procedures)
  • [ ] ABS pipe cutting and gluing
  • [ ] Cast iron work — snap cutter and no-hub coupling use
  • [ ] Manual and power snake operation
  • [ ] Cart Jetter safe setup, operation, and shutdown (if trained)

Installation-Specific Equipment

  • [ ] Pipe threader (if applicable)
  • [ ] Reciprocating saw and hole saws for installation work
  • [ ] Power drill for anchoring and strapping
  • [ ] Laser level for proper pipe grade (1/4" per foot drain requirement)
  • [ ] Pipe strapping tools — correct spacing, approved hangers only

Lifting and Material Handling

  • [ ] Proper lifting technique for water heaters and equipment
  • [ ] Hand truck and dolly use for large items
  • [ ] Trailer loading and securing (if using a trailer)

Vehicle and Trailer Setup

Install vehicles carry a larger stock than service trucks. Production Concierge verifies:

  • Core materials stocked (common fittings, supply lines, hangers, cleanouts)
  • PPE complete
  • Permit forms and documentation supplies on board
  • CO tester present and calibrated

Completion Criteria

  • All tool certifications signed
  • Vehicle/trailer stocked to install standard
  • Ready to begin ride-along phase

Related SOPs

  • Soldering & Flux Safety
  • Daily Vehicle Inspection Checklist
  • Spartan Quality Standards (pipe installation standards)